Get Up to 25% OFF PPE MasksGowns * Limited time only.
SLI MEDICAL IS A WHOLESALE SITE! WE ONLY SELL TO QUALIFIED FACILITIES (Such As Hospitals, Physician Offices, & Distributors). All Addresses are Verified.
TEST

Reproductive Health Test Kit McKesson Consult™ hCG Pregnancy Test 25 Tests CLIA Waived

Diagnostic Upgrade Kit Philips 12-15/16 long leads For use with ECG

$91.39
UPGRADE KIT, ECG AAMI DIAG CABLE & 12-15/16 LONG LEAD
SKU
2001228710
License which authorizes the purchase of regulated products is required

Product Specifications

SLI Medical #1228710
Manufacturer #989803151771
BrandPhilips
ManufacturerPhilips Healthcare
Country of OriginUnknown
ApplicationDiagnostic Upgrade Kit
For Use WithFor use with ECG
Specifications12-15/16 long leads

Features

  • Child; Adult Multi-Patient Use Non-Sterile
UPGRADE KIT, ECG AAMI DIAG CABLE & 12-15/16 LONG LEAD
Additional Information
Product NameDiagnostic Upgrade Kit Philips 12-15/16 long leads For use with ECG
SKU2001228710
Price$91.39
Weight5.00
Featured ProductNo
Manufacturer Sku990000000000
UOMEA
ManufacturerPhilips
Short DescriptionUPGRADE KIT, ECG AAMI DIAG CABLE & 12-15/16 LONG LEAD